South West fact file
Managed and maintained by:
Amey Infrastructure Services
Amey’s central office:
Langmuir Way
Bargeddie
Glasgow
G69 7RW
Total route length of the network in SW: 647km.
Budget for maintaining trunk roads in SW this period: £53.7m.
Number of structures: 1,927.
Amount of precautionary de-icing material used: 9,262 tonnes.
Winter patrol length: 461km.
